Skip to main content



17 March 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

17 March 2009 -- IntelliGantt RC1

Install IntelliGantt Add-In for MS Project (Build 4.0.0.138): Microsoft Project 2007 Add-In

Install IntelliGantt RC1 (Build 4.0.0.138): IntelliGantt Rich Internet Application

Features

  • Both -- Server time zone is now automatically retrieved -- no more setting 'Server Time Zone' manually, though an override is available. (Thanks Pat!)
  • Both -- Duration Remaining, Work Remaining and Cost Remaining. (Thanks to Michael and Bryan)
  • Application -- 64-bit installer support. (Thanks to lots of folks on this one)

Usability

  • Application -- Calculation Options to change how IntelliGantt calculates and presents costs.
  • Application -- Resource options are now in the IntelliGantt menu as well.

Bug Fixes

  • Both -- Odd error condition when the current sharepoint url is more than the default view url. (Thanks Elaine)
  • Both -- Fixed issues with Duration and Work Variance.
  • Application -- UI Refresh issues when changing % complete via Gantt chart.
  • Application -- Creating a new project was creating the first task with an offset.

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional



10 March 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

10 March 2009 -- IntelliGantt RC1

Install IntelliGantt Add-In for MS Project (Build 4.0.0.137): Microsoft Project 2007 Add-In

Install IntelliGantt RC1 (Build 4.0.0.137): IntelliGantt Rich Internet Application

Features

Usability

Bug Fixes

  • Both -- Memory leak found and fixed in MS Project integration. (Thanks Michael)
  • Both -- Worksspace Settings Filter wasn't being saved on initial share. (Thanks Michael)
  • Both -- Projects List Status and Health fields have been localized. (Thanks Peter)
  • Both -- MS Project integration was aborting if flags could not be set (throwing an exception). Now the exception is logged and update continues.

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional



4 March 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

4 March 2009 -- IntelliGantt RC1

Install IntelliGantt Add-In for MS Project (Build 4.0.0.135): Microsoft Project 2007 Add-In

Install IntelliGantt RC1 (Build 4.0.0.135): IntelliGantt Rich Internet Application

Features

Usability

Bug Fixes

  • Both -- DateTime values transitioning from Daylight Savings to non-Daylight Savings was causing an issue.
  • Both -- Duration and Work fields were not being updated properly.
  • Both -- Publishing tasks to Milestones List was failing due to a name collision with the ProjComments column.

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional



2 March 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

2 March 2009 -- IntelliGantt RC1

Install IntelliGantt Add-In for MS Project (Build 4.0.0.134): Microsoft Project 2007 Add-In

Install IntelliGantt RC1 (Build 4.0.0.134): IntelliGantt Rich Internet Application

Features

  • Add In -- Add Members to Resources checkbox to turn whether SharePoint members are automatically added as MS Project resources. (Thanks Michael)
  • Both -- SharePoint Priority and Status localization. A new 'Settings' form lets you specify the Priority and/or Status choice strings. (Thanks Peter)

Usability

  • Both -- When working with SharePoint Project Lists, the 'Add Tasks from SharePoint' option will now check to see if the task matches the Project instead of pulling in all tasks not currently in the project. (Thanks Peter)
  • Both -- Duration and Work fields are now numbers reflecting hours.
  • Both -- Huge speedup when resolving SharePoint members.

Bug Fixes

  • Add In -- Resource Pool was not adding resources to projects that hadn't been shared yet.
  • Both -- Duration and Work fields are now correctly typed as Number fields in SharePoint. (Thanks Bryan)

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional



10 February 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

10 February 2009 -- IntelliGantt BETA

Install IntelliGantt Add-In for MS Project (Build 4.0.0.133): Microsoft Project 2007 Add-In

Install IntelliGantt BETA (Build 4.0.0.133): IntelliGantt Rich Internet Application

Features

  • Application -- Web browser integrated as another view option. This let's you flip between grid/gantt, dashboard and SharePoint views in IntelliGantt.
  • Application -- In the web browser view, if you click on a task link of a project that is shared, the corresponding IntelliGantt task is selected as well.
  • Application -- Updating a project when the web browser view is enabled will issue a refresh to the web browser upen completion.

Usability

Bug Fixes

  • Add In -- A user was unable to import SharePoint tasks into MS Project. We traced it down to an unintialized variable. (Thanks Scott).
  • Application -- Costing bugs.
  • Application -- Export to MS Project was broken. (Thanks Levi)

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional



6 February 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release

6 February 2009 -- IntelliGantt BETA

Install IntelliGantt Add-In for MS Project (Build 4.0.0.131): Microsoft Project 2007 Add-In

Install IntelliGantt BETA (Build 4.0.0.131): IntelliGantt Rich Internet Application

Features

  • Add In -- MSI package to install IntelliGantt Add In for Microsoft Project 2007 is available.
  • Application -- 64-bit build is available

Usability

  • Application -- Resource pool behavior with respect to checking next to name was not matching expectations. Majority of customers expected person to be added to the project instead of added to the filter list. So, we changed it to add a resource to the project after clicking in the People tree.
  • Application -- Assignments for summary tasks were not including the work of the summary task itself. Now work of all children and the work of the summary task is included in the work value.
  • Application -- Moved the Estimate and Actual drawing lines a bit closer together to look better on the Gantt.
  • Both -- Interesting issue with Active Directory groups and SharePoint permissions-- sometimes they have none! There is a knowledge base article and a hotfix, but to be safe we make sure IntelliGantt thinks the user who has successfully communicated with sharepoint has the privileges to contintue to do so.(Thanks to Anthony, Rick and Fernando)

Bug Fixes

  • Add In -- In fixing one XML -> Text -> XML translation, we broke a Text -> XML -> Text translation. The issue was handling 'odd' characters in the XML stream like &.
  • Application -- Assignment Cost, Cost Estimate and Cost Actual were not being disabled for summary task editing
  • Application -- If an assignment was selected and the workspace context changed by clicking in the Workspaces view on the left, an exception was occuring for an out of range grid.

Open Issue

Requirements

  • Both -- .NET 3.5 SP1 (included with install)
  • Both -- Version 9 of C Runtimes (included with install)
  • Add In -- VSTO 3.0 SP1 (included with install)
  • Add In -- Microsoft Project 2007 Standard or Professional

Previous Updates