18 May 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
18 May 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.150): Microsoft Project 2007 Add-In
Features
Usability
- Both -- Tested and verified to work with the 1.1 Task Master release from Bamboo Solutions.
- Add In -- When performing a 'Save As' operation on a project that has been shared, a message tells you about the issue concerning MS Project duplicating Project Summary Task Guid values.
- Application - When adding a resource to the pool via the members pane, the resource was being removed from the current project and added to the pool. Now the resource stays in the current project.
- Application - When adding a new subtask, the new task is placed under the new parent according to the new parents start date. (Thanks Charlie)
- Application - A new task is no longer added automatically when you drop down to the first empty row. Now you must enter a value of some kind. (that one was bugging me)
Bug Fixes
- Add In -- Some clients were reporting the IntelliGantt menu would 'disappear' occassionaly. Reworked the initialization and added logging information if problem occurs.
- Application -- When updating or merging a resource, if the hourly rate is untouched (i.e. stays at $0.00) an 'Invalid Cast' exception was being thrown.
- Application -- Assignments tab wasn't refreshing after an update.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
6 May 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
6 May 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.149): Microsoft Project 2007 Add-In
Features
Usability
Bug Fixes
- Both -- Various Basecamp integration bugs
- Both -- Resource updates during synchronization with SharePoint were causing problems so extra logging added.
- Application -- When adjusting Start and Finish dates via the task grid extra hours were being added which moved the start date into the future.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
27 April 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
27 April 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.147): Microsoft Project 2007 Add-In
Features
- Both -- Integration with Bamboo Solutions Task Master
- Both -- Initial integration with Basecamp
Usability
Bug Fixes
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
21 April 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
21 April 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.146): Microsoft Project 2007 Add-In
Features
- Both -- SharePoint settings page has option to force initial login. This helps IntelliGantt work with Form-Based SharePoint logins. (Thanks Phil)
Usability
- Application -- You can now 'Share', 'Update', 'Export' and 'Import' folders, which means the operation will recurse to all children. This makes it easy to update multiple projects by clicking on the parent folder.
- Both -- Additional logging information captures server time zone and date/time comparisons.
Bug Fixes
- Both -- Export to MindManager 8 fixed.
- Both -- Export to Excel fixed.
- Both -- Blank Workspace Settings fixed (caused by the new 'Default' Workspace Settings feature).
- Both -- Actual Work as not being read correctly from data file.
- Both -- Work, Estimated Work, Actual Work and Remaining Work values (along with Duration) are now rounded to the minute to help MS Project integration. (Thanks Bryan and Travis)
- Both -- Updated fields are now timestamped two seconds greater than the SharePoint modification date for a field so that automatated IntelliGantt process will update correctly. (Thanks Bruno)
- Both -- Remaining Work field added to 'Actuals' initial data packaging.
- Add In -- MSI package now shows the target user account installation and defaults to 'Everyone'.
Open Issue
- Basecamp is visible but not entirely there yet. Coming Soon!
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
7 April 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
7 April 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.144): Microsoft Project 2007 Add-In
Features
- Application -- Field specific unread markers
Usability
- Both -- New menu command under 'Help' that creates an email message to support with the log attached.
- Both -- Additional logging information captures server time zone and date/time comparisons.
Bug Fixes
- Both -- SharePoint tasks with multiple assignments when changing Work values.
- Application -- Add Template Folder was not hookup up.
- Application -- If a folder was selected and then the mouse was moved over a link endpoint and clicked, big project. Fixed.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
3 April 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
3 April 2009 -- IntelliGantt RC1
Install IntelliGantt Add-In for MS Project (Build 4.0.0.143): Microsoft Project 2007 Add-In
Features
Usability
- Application -- If user edits the display initials for a member, then those initials are kept rather than overwritten after synchronizing. (Thanks Charlie)
Bug Fixes
- Both -- Baseline Work was not being persisted correctly when task assigned. (Thanks Bryan)
- Both -- Bug when saving Text1 - Text30 data via SharePoint updates.
- Both -- Bug when using 'Member Read' and 'Member Write' with Date3 - Date5. (Thanks Bruno)
- Both -- Bug when creating the WBS code. Should have leading zeros rather than trailing zeros so the sort in SharePoint is correct. (Thanks Charlie)
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
24 March 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
24 March 2009 -- IntelliGantt RC1
Install IntelliGantt Add-In for MS Project (Build 4.0.0.140): Microsoft Project 2007 Add-In
Features
- Both -- SharePoint DateTime fields are now automatically set to show Date and Time. This helps the synchronization not make as many changes after a SharePoint user updates a task. The reason is that, if no time value was visible, SharePoint would set the time value to midnight.
- Application -- Support for pasting from IntelliGantt Plus. (Thanks Anthony)
Usability
Bug Fixes
- Both -- Automatic server timezone discovery had a bug-- off by one error for timezone calucations.
- Application -- Copy & Paste bug fixed that didn't should task dependencies in the Gantt after pasting.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional